Previous arrow   Next arrow
518 First St: During Construction
Slide 63 of 127
The original stairs to the basement. The basement was open to the outside to allow for coal deliveries. After conversion to oil in the 1920s or 1930s, the porch above was enclosed.

During Construction Pictures: Slide 63 of 127