Previous arrow   Next arrow
During-Construction: Slide 81 of 87
The attic window is out for restoration. Where the blue is will be painted fish scale cedar shingles. The second floor windows are the originals restored. Doors out for restoration.

During Construction Pictures: Slide 81 of 87